- High voltage and Very High voltage overhead lines pole assembly and installation
- Power stations
- Internal grid connections
- Mechanical installations for renewable projects (wind and solar)
WESEE provides a wide range of Electrical Works for Wind Parks in partnership with Electrogrup Romania. Specific works include:
– Power Substations construction, installation and setup
– Power Transformers installation and setting
– Wind farm underground or aerial power cabling installation from WTG’s to connection points/substation
– Various HV – MV electrical works required during wind farm installation and operation